Marcus' Model Railway Journey

Status
Not open for further replies.
1732150490224.png

LNWR: "The Corridor"​


This is number 4 of a series of 10 postcards showing paintings of pre-grouping (1923) express trains in Britain. The artist is Eric Oldham.

This card shows:
"The 2 p.m. "Corridor" between Tebay and Shap Summit. 4-6-0 Locomotive No. 1159 Ralph Brocklebank."
 
train.jpg

North British Railway Sir Walter Scott​


This is number 6 of a series of 10 postcards showing paintings of pre-grouping (1923) express trains in Britain. The artist is Eric Oldham.

This card shows:
"N.B.R. 4-4-0 No. 898 "Sir Walter Scott" leaving Aberdean with an Edinburgh express."

This was one of the North British Railway's D29 class designed by W.P. Reid and built by the North British Locomotive Co. (works number 18859) in 1909. It was renumbered to 2403 under the 1946 LNER 1946 renumbering scheme and just survived to become British Railways stock in 1948. It was withdrawn in March 1948 without actually carrying it's BR number 62403.
 
train.jpg

Shooting Star​


This is number 7 of a series of 10 postcards showing paintings of pre-grouping (1923) express trains in Britain. The artist is Eric Oldham.

This card shows:
"G.W.R. 4-6-0 No. 4009 "Shooting Star" climbing Dainton Bank with a Paddington-Plymouth express.

4009 Shooting Star was a "Star" class locomotive built at Swindon Works in 1907 to the design of G.J. Churchward. It was one of a number of the class which were later converted to "Castle" class locomrives, in the case of 4009 in January 1936 when it was also renamed "Lloyds" and re-numbered "100 A1".

It was an early class withdrawal in March 1950, interestingly five months before the last new "Castle" was turned out from Swindon in August of that year.
 
train.jpg

Great Central Atlantic​


This is number 8 of a series of 10 postcards showing paintings of pre-grouping (1923) express trains in Britain. The artist is Eric Oldham.

This card shows:
GCR 4-4-2 No. 363 Near Hadfield with a Manchester-Marylebone express."

No. 363 was a C4 class "Atlantic" locomotive built to the design of J.G. Robinson for the Great Central Railway in 1907. It was renumbered as LNER 5363 at the grouping in 1923 and again under the 1946 renumbering scheme to 2925. I survived to become British Railways stock in 1948 and was withdrawn from Boston shed in April 1949. The class became extinct in February 1951 with the withdrawal of 62900 and 62908. None of the class of 17 locomotives actually carried their British Railways number.
 
train.jpg

SECR train at Shakespeare Cliff​


This is number 9 of a series of 10 postcards showing paintings of pre-grouping (1923) express trains in Britain. The artist is Eric Oldham.

This card shows:
"SECR 4-4-0 Mo. 470 passing Shakespeare Cliff, Dover, with a down train."

No. 470 was a "D" class locomotive built in August 1906 at Ashford Works to the design of Harry Wainwright for the South Eastern & Chatham Railway. It was rebuilt in November 1926 by Richard Maunsell to class D1 producing what was, to all intents and purposes, a new locomotive. No. 470 survived to become number 31470 in British Railways stock and was eventually withdrawn from service in June 1959.
 
train.jpg

Great Eastern Express​


This is number 10 of a series of 10 postcards showing paintings of pre-grouping (1923) express trains in Britain. The artist is Eric Oldham.

This card shows:
"G.E.R. 4-4-0 No. 1818 near Brentwood with Cromer-Liverpool St. train."

1818 was a D16 class locomotive built at Stratford Works to the design of J.N. Holden for the Great Eastern Railway. It was rebuilt in June 1923 to class D16/3 by the LNER under the direction of Nigel Gresley and became LNER number 8818. It was renumbered again to 2589 under the LNER renumbering scheme of 1946. On Nationalisation in 1948 it became British Railways number 62589 and remained in service until September 1959 by which time it was one of the last survivors of the class. Number 62613 was the last to go in October 1960 and none were preserved - a pity as they were a most attractive looking class.

This completes the run of this postcard series.
 
Wednesday 20 Nov 2024

1732194081051.png

Bath bridge makes list of top ten ‘most bashed bridges’ in the UK

Region & Route: Wales & Western: Western | Wales & Western
  • New figures released by Network Rail show that a bridge in Twerton, a suburb of Bath, was the tenth most-struck bridge in the UK over the past year.
  • The bridge was struck 10 times, resulting in over 12 hours of disruption caused by the collisions. Bridge strikes at the location were up by over 300% on the previous year, when vehicles struck the bridge a total of three times.
  • Network Rail urges lorry drivers to ‘Wise Up, Size Up’ by knowing the height of their vehicles and choosing suitable routes before they head out on journeys.
train.jpg

Bridge strikes graphic


New figures released by Network Rail reveal heavy goods vehicles (HGVs) colliding with bridges caused over 100 days (150,000 minutes) of delays for rail passengers last year. From 1 April 2023 to 31 March 2024 there were 1,532 reported bridge strikes - one every six hours - which cost Britain’s rail industry around £20m in delays, cancellations and repairs.

The new figures come as Network Rail urges haulage operators and their lorry drivers to ‘Wise Up, Size Up’ and take better care on the roads.

Delays, cancellations and repairs caused by vehicles hitting the Jews Lane bridge in Twerton, Bath, resulted in costs of almost £93,000 – the highest of any of the bridges appearing in the top 10 this year. Other bridges found on Network Rail’s Western route that had featured in last year’s top 10 dropped down the rankings, with the bridge at Brettle Road in Burnham – last year’s number nine – coming in at number 20 after seeing fewer strikes.

Network Rail works closely with industry partners to tackle bridge strikes. Its ongoing ‘Wise Up, Size Up’ campaign reminds lorry drivers to check the height of their vehicles and plan their route in advance to avoid low bridges. Network Rail also has a team of bridge strike champions covering each route across Britain, who raise awareness by visiting local haulage companies. The last two consecutive years has seen a reduction in the total number of incidents recorded on the network, with a 4% reduction in the last year alone.
 
Last edited:
WATCH VIDEO: UK BRIDGE STRIKE COMPILATION

1732194445440.png


Click link to watch:"https://fast.wistia.net/embed/iframe/fmmu17gtng"


Martin Frobisher, Network Rail’s group safety and engineering director, said: “Every time a vehicle hits a bridge it can serious safety issues for road and rail users. To compound matters, these incidents can delay tens of thousands of passengers while we inspect the bridge and repair any damage – creating cost from public funds which should be used upgrading and improving our network.

“We’ve done a lot of work with transport partners to tackle bridge strikes and it’s encouraging to see this is paying off with a general downward trend in the number of incidents. But with a strike every six hours there’s still much to do and we urge operators and drivers to properly plan their routes, know the height of their vehicles and be vigilant for road signs showing the height of bridges. We will report those who don’t to the Traffic Commissioners and Network Rail always looks to recover the entire repair and delay costs from the driver and the operator.”

Most struck railway bridges in Britain 2023/24:
  1. Stuntney Road, Ely - 18 strikes
    2. Stonea Road, Stonea - 17 strikes
    3. Lower Downs Road, Wimbledon - 17 strikes
    4. Watling Street A5, Hinckley - 15 strikes
    5. Harlaxton Road, Grantham - 14 strikes
    6. Doncaster Road (A638), Ackworth, Ferrybridge - 13 strikes
    7. Warminster Road Bridge, Wilton - 11 strikes
    8. Abbey Farm, Thetford - 11 strikes
    9. Kenworthy Road Bridge, Homerton - 11 strikes
    10. Jews Lane, Twerton - 10 strikes
Bridge strikes reported across the railway network in the last five financial years:

Year 2019/20 – 1,825 strikes

Year 2020/21 – 1,650 strikes

Year 2021/22 – 1,864 strikes

Year 2022/23 – 1,588 strikes

Year 2023/24 – 1,532 strikes
 
Last edited:
Thursday 21 Nov 2024

1732218633143.png


Newport bridge earns unwanted top spot as Network Rail urges drivers to take better care at railway bridges

Region & Route: Wales & Western | Wales & Western: Wales & Borders

Network Rail is urging drivers to ‘Wise Up, Size Up’ and take better care on the roads as it emerged several of Britain’s most bashed bridges are on the South Wales Main Line.

train.jpg

Bishton Road Bridge in Newport has had 'goalposts' installed to prevent bridge strikes


New figures released by Network Rail reveal heavy goods vehicles (HGVs) colliding with bridges caused more than 100 days (150,000 minutes) of delays for rail passengers across Britain last year. From 1 April 2023 to 31 March 2024 there were 1,532 reported bridge strikes across the whole network – one every six hours – which cost Britain’s rail industry around £20m in delays, cancellations, and repairs.

In Wales, Trafle Mill Underbridge in Gowerton, Swansea, was hit seven times during the 12-month period, placing it 18th overall on Network Rail’s list of most bashed bridges in Britain.

But another bridge on the South Wales Main Line – Bishton Road Bridge in Newport – is in the top two in Britain for both the number of delay minutes caused by it being struck and the overall cost of those delays.

The bridge’s location on the South Wales Main Line between Newport and Severn Tunnel Junction stations – and the fact the line must be closed and the bridge inspected if struck by a vehicle – contributed to 2,888 delay minutes (48 hours) in the 12-month period to March this year.

Only the Cab Road Entrance Underline Bridge at London Waterloo, with 5,126 delay minutes (85 hours), saw more delays caused by vehicle strikes.

When it comes to the financial burden of bridge strikes, though, Bishton Road Bridge takes the unwanted No 1 spot, with strikes to the structure costing the rail industry more than £396,000 in 12 months.

But measures put in place since these statistics were recorded give hope that the Bishton Road Bridge’s appearance at the top of the charts will prove to be a one-off.

Network Rail has worked in partnership with Newport City Council to fund ‘goalposts’, like those used in car parks with height restrictions, on both approaches to the bridge to stop oversized vehicles getting as far as the bridge itself.

The early evidence suggests the collaboration is paying off.

Daniel Brookfield, Network Rail asset engineer (structures) and Wales and Borders’ ‘bridge strike champion’, said: “We work closely with local authorities to improve bridge strike mitigation measures for all our vulnerable structures, but we pay particular attention to those that are frequently hit and have high delay minutes and costs.

“Bishton Road Bridge is a good example of collaborative working, where we funded the goalposts that Newport City Council constructed and will maintain.

“We carried out a full review of the site, and the local authority delivered a scheme that has improved the advanced warning signage, improved the lining on the road, and installed the goalposts that should stop any strikes in the future.

“This bridge is on our busiest stretch of track connecting South Wales with the rest of the UK, and the structural form means that following a strike it must remain closed until it can be examined to make sure the track alignment has not been affected. That is why the delay minutes and associated costs are so high for the 2023-24 period, but we are confident the measures we’ve taken since mean this will prove an anomaly.”

Martin Frobisher, Network Rail’s group safety and engineering director, said: “Every time a vehicle hits a bridge, it can cause serious safety issues for road and rail users. To compound matters, these incidents can delay tens of thousands of passengers while we inspect the bridge and repair any damage – creating cost from public funds which should be used upgrading and improving our network.

“We’ve done a lot of work with transport partners to tackle bridge strikes and it’s encouraging to see this is paying off with a general downward trend in the number of incidents. But with a strike every six hours there’s still much to do and we urge operators and drivers to properly plan their routes, know the height of their vehicles and be vigilant for road signs showing the height of bridges.

“We will report those who don’t to the Traffic Commissioners and Network Rail always looks to recover the entire repair and delay costs from the driver and the operator.”
 
Last edited:
24th November, 2024

Storm Bert: Welsh steam railway closed after landslip


train.jpg

Landslip at the Brecon Mountain Railway


The Brecon Mountain Railway has had to close today due to landslip damage caused by Storm Bert.

Trains are cancelled with expert help on the way to assess the situation and possible repairs.

The railway hopes to fulfil upcoming bookings, with trains next set to run on Saturday, 30th November.


We’ll provide a further update within the next 48 hours. Thank you so much to everyone who has been so understanding and supportive—your kind words mean the world to us.
All of our team (and yes, even the Elves and Santa) are crossing their fingers for a speedy resolution!
Brecon Mountain Railway Spokesperson
 
24th November, 2024

Class 43 locomotive finds new home at Devon heritage railway


train.jpg

Power Car 43161


The Plym Valley Railway has announced that Ex-GWR HST Power car, No. 43063, has entered preservation with them after being withdrawn from service.

43063 is set to arrive in the next few days, along with sister power car No. 43161.

43063 will undergo cosmetic restoration at the railway in the Spring of next year, with the locomotive being put on display, allowing members of the public to climb into the cab.

43161 will be a source of spares for 43063 and other members of the class, so once the cab is lifted, the rest of the locomotive will be cut up during the closed season.

It is hoped that both locomotives will be on display during the Christmas train season, which starts on the 30th of November.

“We would like to thank our friends at GWR for this fantastic opportunity to acquire and preserve one of the most recognised locomotives in the world. I have wanted to preserve a power car for years and am so pleased that we have been given the opportunity. There will soon be a time when the HST is not a regular visitor to the city so to have one preserved less than a mile from where they have been based for decades is amazing. If you would like to get involved in the restoration of our new asset, please get in touch with the railway”
Daniel Phillips, Plym Valley Railway Co. Ltd Chairman
 
train.jpg

North British Type 1 (Class 16) D8408 Stratford 4/67


The type was ordered by British Railways (BR) as an element of the 1955 Modernisation Plan.

The design was largely derived from North British's earlier prototype locomotive, designated No. 10800, produced during the late 1940s; it also incorporated several engineering approaches common to steam locomotives, the company allegedly having difficulty transitioning to the new traction format.

Akin to several other Type 1 designs, they were relatively compact locomotives that were intended primarily for local freight traffic.

The performance of the type was found to be lacking in comparison with its peers, thus the potential for follow-on orders evaporated and no further examples were constructed beyond the original batch.

The Class 16 shared numerous design features with those used on subsequent locomotives by the company, particularly the British Rail Class 21 locomotive.

Being both non-standard and fairly unreliable, the locomotives were an obvious candidate for early withdrawal despite barely being ten years old as BR planners were coming to this conclusion.

Accordingly, they were all withdrawn between February and September 1968; all ten Class 16s had been cut up for scrap by the end of 1969.
 
25 November 2024
2742

URGENT UPDATE - Rail customers urged to check before they travel on Monday following Storm Bert​

train.jpg

Transport for Wales passengers


Passengers are being urged to check for the latest information before travelling as a number of routes across Wales and Borders will be closed tomorrow (November 25) due to the impact of Storm Bert.
  • There will be no rail services between Llanhilleth and Ebbw Vale on Monday 25 November, rail replacement services will be in operation.
  • Rail services are expected to be severely impacted on the Radyr to Treherbert/Aberdare/Merthyr Tydfil line, with limited rail replacement capacity available.
  • The Marches line between Newport to Shrewsbury will be closed until at least midday and rail replacement provision will be extremely limited.
  • The Heart of Wales line between Shrewsbury and Llanwrtyd will be closed until at least midday and some roads remain impassable on this route, so rail replacement services are likely to be very limited.
  • Lydney to Gloucester, line is currently closed, rail replacement services will be in operation.
Rail services on Monday will be subject to ongoing disruption across the network, which may result in delays and short notice cancellations throughout the day.

Transport for Wales and Network Rail engineers are continuing to work round the clock to deal with the impact of Storm Bert on the railway line.

Tickets for Monday 25 November can be used on Tuesday 26 November and ticket acceptance with other operators may be available, passengers should check tfw.wales for the latest information.

A spokesperson for Transport for Wales said:

‘The safety of our customers and our colleagues remains our absolute priority and we must ensure the network is safe to operate services. Because of the extreme weather caused by Storm Bert we’re urging our customers to check before they travel to ensure the service is operating. I’d like to thank our customers for their understanding and patience.”

2718
 
Last edited:
26 November 2024
2742

Pay As You Go extended to almost 100 stations

train.jpg

TfW PAYG Cardiff Central

Rail passengers travelling across the South Wales Metro can now access easier ways to pay and great value fares with a new Pay As You Go system.

Transport for Wales is the first train operator outside of London and the South East of England to introduce this paying system.

The tap in, tap out technology is available at 95 Transport for Wales (TfW) stations throughout South Wales, including all Valleys lines and on routes to Bridgend, Maesteg, the Vale of Glamorgan, Abergavenny and Chepstow.

Pay As You Go can be used for single journeys with fares starting at just £2.60, and with automatic daily and weekly capping they offer a significant saving against standard Anytime singles and 7-day season tickets.

There’s no need to purchase a physical or digital ticket, passengers can simply tap in and out using their bank card. Conductors now carry a card reader which validates if a passenger has tapped in at the start of their journey.

Cabinet Secretary for Transport and North Wales, Ken Skates added: “I am delighted that we’re now able to offer passengers a simpler and fairer way to travel through the new Pay as You Go system.

“This is another significant milestone towards our ambition to transform our railways and build a world-class metro service which enables us to deliver high-quality ‘turn up and go’ services for passengers.”

Alexia Course, Chief Commercial Officer at Transport for Wales said: “Since launching Pay As You Go as a trial at the beginning of the year we’ve already seen more than 65,000 people choosing this simple and cost-effective way to pay for their travel.

“We’ve made a significant investment in new gate lines for our stations and our team has worked quickly to get the new technology installed, tested and ready for passengers by the end of the year.

“This is another important step in the South Wales Metro project and is the first Pay As You Go scheme, where passengers can simply use their bank card, outside of London and the South East of England.”

2718
 
26th November, 2024

Nottingham Railway Christmas theme tune reaches number 1 in music chart


train.jpg

GCRN Christmas Express

The Great Central Railway (Nottingham) is gearing up to run its first Christmas trains in over 4 years, with the added surprise that the theme tune to their Christmas train rides has reached unbelievable heights in the music charts.

With just under a week to go until their first Jingle Bell Express trains start running, the song ‘Jingle Bell Express’, which accompanies the festive train rides and show on the Great Central Railway (Nottingham), has reached No.1 in the UK Children’s Music iTopChart.
 
Last edited:
26th November, 2024

TransPennine Express celebrate 5th Anniversary of Nova trains

train.jpg

TransPennine Express Nova 1 train No. 802205


The Nova train fleets operated by TransPennine Express (TPE) have reached their fifth birthday in revenue-earning service.

Over the course of the last five years, both train fleets have improved rail services across the TransPennine network.

They also seen several enhancements to augment passenger comfort.

Notable improvements encompass Wi-Fi availability in both standard and first-class, increased legroom, more spacious tables, extra power outlets, bicycle storage facilities, and digital seat reservation systems.
 
Last edited:
1732636087792.png

TransPennine Express Nova Train


The 19-strong Nova 1 fleet (802/2 class) was built by Hitachi. These trains are bi-mode electric and diesel units, with one unit being converted to run as a tri-mode unit which can run off battery power.

These trains are normally seen running on services between Liverpool, Manchester, Newcastle, and Edinburgh.

Each train is composed of 5 coaches and has 342 seats. When new, they had an increased 161 seating capacity over the trains they replaced. Since their service began, they have carried over 28 million passengers.

The Nova 2 fleet (397 class) is currently maintained by Alstom, but they were originally built by CAF. These trains are fully electric and operate on Manchester Airport, Liverpool, Glasgow, and Edinburgh services.

This fleet of 12 trains also consists of five coaches with a seating capacity of 286. Since their operating career began, they have carried 14 million passengers.

These trains are currently trailing an AI-powered speech-to-text announcement system, which will aid passengers with hearing impairments. Once rolled out, this onboard announcement system will be the first of its kind in Britain.
 
Last edited:
1732636228097.png

TransPennine Express Nova 2 train


Both fleets have also helped TPE reduce their carbon emissions and noise levels and as the trains now operate over an extra 70 miles of electrified lines across the north of the country with this set to expand, thanks to infrastructure projects, the trains continue serving passengers across vital routes, with their crucial upgrades to rail travel.

“It’s a special day to mark the five-year anniversary of our Nova fleet. These trains have played a pivotal role in transforming the level of service we can provide across the North and Scotland.
Our expanded fleet of high-speed trains provide greater seating capacity, improved connectivity, and a higher standard of onboard experience. The Nova fleet continues to support our mission to create a greener, better-connected network.”

Chris Nutton, Major Projects & TRU Director at TPE
 
27th November, 2024

3163

Engineering work to affect journeys on Cambrian Line between Machynlleth and Pwllheli in December

Region & Route: Wales & Western | Wales & Western: Wales & Borders

train.jpg

Engineers renewing track (generic image)


Passengers are urged to check before they travel between Machynlleth and Pwllheli next month, when Network Rail will be carrying out essential engineering work on the Cambrian Line.

Buses will replace trains between Machynlleth and Pwllheli stations from 4.45pm on Sunday 8 December to 7.30am on Monday 16 December.

Network Rail engineers will be replacing more than 1km of track between Dyffryn Ardudwy and Harlech stations.

They will install 1,800 new sleepers and 3,600 tonnes of ballast (track stone) using an auto hopper train which will be refilled from a virtual quarry at Marine Parade, Barmouth.

Nick Millington, Network Rail Wales and Borders route director, said: “Our teams will be working around the clock to carry out this important track renewal on the Cambrian Line. The age of the track and its exposed location on the Cambrian Coast means we must replace it this winter.

“We recognise there is never a good time to close the railway for more than a week. But this allows us to minimise wider disruption and do the work in a more cost-effective way than if we had to return over several weekend shifts.

“I would like to thank passengers for their patience and understanding and urge them to check their journeys before travelling.”

Transport for Wales (TfW) will run a mixture of fast and stopping buses.

On Sunday 8 December, the 16:52 and 18:55 Machynlleth to Pwllheli services will be replaced by buses.

From Monday 9 December and Sunday 15 December, buses will replace trains all day.

On Monday 16 December, the 06:29 and 07:29 Pwllheli to Machynlleth services will be replaced by buses.

These replacement buses will run earlier than usual to connect with train services at Machynlleth.

Details are available in journey planners on the Transport for Wales website and passengers are strongly advised to check for the latest information before travelling.
 

27 November 2024


Marcus & Cleo Have Another Bus Adventure into Cardiff!

Well, we used the bus again to travel into and out of Cardiff.

Did a spot of shopping and had a few drinks in the 'Great Western'!

Cleo bought a couple of bargains in a 75% off sale!. :)

Our first bus [No.548], was the usual ADL Enviro 200


train.jpg

Cardiff Bus 548 CN17EYU​

 
28th November, 2024

Great Western Railway warns of storm disruption


train.jpg

Newbury station


Great Western Railway has urged passengers to continue checking train times before travelling, with Storm Bert still affecting trains.

The line between Swindon and Bristol Parkway has been affected by flooding near Chipping Sodbury, and Network Rail is beginning to clean up debris.

This is expected to take until the end of the day today (28th November), and until this is reopened, an hourly service will run between London Paddington and South Wales using a diversionary route, extending journey times by up to 45 minutes.

Due to storm damage, platform one is currently closed at Newbury station which means that GWR is having to reduce the number of trains they run to Newbury.

Trains that run between Newbury and London Paddington direct will not run. Stopping trains between Newbury and Reading and between Newbury and Bedwyn will run, and high-speed long-distance trains that call at Newbury will also run.
 
28th November, 2024

Southeastern to add more trains to its fleet

train.jpg

Class 377 "City Beam" train at Rochester


Southeastern is expanding its operating fleet with 13 more Class 377 trains set to enter service between now and the end of 2025.

Following a joint agreement with Govia Thameslink Railway, Southeastern will have two additional Class 377 units in service for when the new timetable starts in December.

The Class 377 trains will provide a more reliable service and a better experience than customers currently experience with the existing trains, and feature air conditioning, at-seat plug sockets, and better passenger information systems.
 
1732807288743.png

Southern Class 377 train


Another 11 Class 377 trains are due to enter passenger service before December next year.

The new units are in addition to 23 existing Class 377s already operated by Southeastern, with Govia Thameslink Railway continuing to be responsible for their maintenance.

The new trains will allow older “Networker” trains on the Maidstone East and Tunbridge Wells lines to be retired from service.

They are part of a programme for upgrading Southeastern’s fleets of trains to provide a better and more reliable service and follow 30 new City Beam trains being introduced onto Southeastern’s Metro routes.
 
1732807396275.png

Class 377 trains at Selhurst Depot


Southeastern’s new timetable, which starts on Sunday, 15th December, includes 220 more services across the Southeastern network and extending two evening services on weekdays from Charing Cross to terminate at Ashford International instead of at Maidstone East.

As well as the new trains, Southeastern’s Class 395 high-speed trains are undergoing a £27 million refurbishment project, with 22 out of the 29 units having already received a full interior refresh with new seats and carpets, LED lighting, and USB at-seat charging.

An announcement is due shortly about refurbishing the existing Metro fleet and a procurement programme for replacing the existing Networkers with new or upgraded trains, and 30 more Class 379 Electrostars will be introduced early next year.
 
1732807504902.png

Comparison of old Class 313 and new Class 377 trains


“The arrival of these trains is a key milestone in our ongoing work to provide a more reliable service by modernising our fleet. “The Class 377s have better acceleration and braking than the Networkers they’re replacing. This should help us provide a more reliable service, while providing a better experience for customers.”

Sophie Barker, Head of Major Programmes at Southeastern
 
Status
Not open for further replies.
Back
Top