Marcus' Model Railway Journey

Status
Not open for further replies.
22 October 2024

2626


Slippery rails cause disruption to trains across Wales

train.jpg

Transport for Wales service at Hereford

Transport for Wales is urging passengers to plan ahead, as slippery rails caused by the autumn leaf-fall season is causing delays across the network.

The lines affected are Hereford – Abergavenny, Shrewsbury – Swansea, Chester – Wrexham General, Bidston – Wrexham Central and Llandudno Junction – Blaenau Ffestiniog.

The Heart of Wales is currently closed until further notice, with a number of bus operators on standby on the other routes should cancellations need to be made.

Trains may be cancelled or delayed by up to 60 minutes. Disruption is expected until the end of the day.
 
Last edited:
train.jpg

The scene of the collision

The Rail Accident Investigation Branch (RAIB) deployed a team of inspectors to the site of the crash in Llanbrynmair, in Powys, last night.

This was an initial deployment, and once the site is inspected, decisions will be made on the need for further resources.

The primary aim of the RAIB team is to gather evidence and work through the crash site, and an update is expected shortly.

The RAIB is a British government agency that independently investigates rail accidents in the United Kingdom in order to find a cause, not to lay blame.

In the initial aftermath of the crash, the RAIB inspectors will be on site to interview all witnesses, examine the trains and tracks and gather all digital evidence, such as CCTV if it exists on the trains.

There should be “on train data recorders” fitted to the trains involved - they are like a “black box” and would gather anything that had been happening.

After an incident, the data can be downloaded and analysed.

The RAIB will then be trying to determine what caused the accident and would then make recommendations.

Generally speaking, the RAIB would aim to complete an investigation within a year of the occurrence.
 
1729608897777.png

Anthony Hurford was a passenger on the Shrewsbury-bound train

Anthony Hurford, a passenger on the Shrewsbury-bound train, said he felt "pretty shell-shocked" by the incident.

"The word that keeps coming to my head is just brutal really," he told BBC Breakfast.

"Just going from, I don't know how fast we were going, maybe 40, 50, 60 miles an hour, to nothing in the blink of an eye.

"Somehow my body bent the leg of a table and ripped it off its bolts attached to the wall.

"Suddenly I was on the floor with my laptop strewn ahead of me, wondering what the hell had happened."

Mr Hurford described the train trying to stop at lights, but said "for whatever reason", it didn't come to a halt.

"There must have been 30 to 40 people from fire [service]," he added.

"There was British Transport Police who had come from Birmingham, there were three helicopters, people had come from north and south Wales as far as I'm aware.

"I was checked by three or four different medics."
 
Last edited:
Two trains have collided at Talerddig, Wales.

Both trains are reported to be Class 158s running in 2 car sets and as we know the Class 158 stands up very well in this sort of event.

The trains involved are:
1S71 Machynlleth to Shrewsbury
1J25 Shrewsbury to Aberystwyth

Realtime trains says
1S71 = 158824
1J25 = 158841


They are definitely 158s since they're passenger trains on the Cambrian.
 
22 Oct 2024
1729614120732.png

Update on Powys rail incident

Joint statement: Network Rail and Transport for Wales

1729613922098.png


Joint statement: Network Rail and Transport for Wales

At 7.29pm on Monday 21 October, two TfW trains were involved in a low speed collision near Llanbrynmair in Powys, Mid Wales.

Sadly one passenger has passed away, and a number of other people are being treated for injuries at nearby hospitals.

Our first thoughts are with the family and loved ones of the man who has lost his life, as well as all the other people involved in this incident.

The Cambrian railway east of Machynlleth will be closed while specialist teams continue their investigations, and we urge passengers not to travel to this part of the network.

We're extremely grateful to the emergency services who attended the scene and helped our passengers and staff in challenging circumstances.

we are working closely with other agencies, including emergency services, to understand how this incident happened and they will have our full support.

1729614410040.png
 
1729669906415.png

Press release

Collision of two passenger trains at Talerddig, Powys, Wales​


The following press statement is issued by the RAIB about its investigation into the collision of two passenger trains at Talerddig, Powys, Wales

From: Rail Accident Investigation Branch Published: 22 October 2024

1729669521458.png


At around 19:26 on the evening of 21 October 2024, the 18:31 Transport for Wales passenger service from Shrewsbury to Aberystwyth collided with another train on Network Rail’s Cambrian line, approximately 800 metres west of the passing loop located at Talerddig, Powys.

Initial evidence suggests that collision occurred at a speed of approximately 24 km/h (15 mph).

The second train involved was the 19:09 Machynlleth to Shrewsbury passenger service, also operated by Transport for Wales.

One passenger tragically died and four other people were seriously injured.

Eleven more people sustained injuries which required hospital treatment.

RAIB was notified of the accident at 19:45 on the night of the accident and immediately dispatched a team of inspectors to examine the site and collect evidence.
 
1729669942315.png


train.jpg


Additional RAIB staff and specialist equipment have arrived at the site of the accident throughout today and we continue to work in conjunction with the British Transport Police, the Office of Rail and Road and the railway companies involved to secure the necessary evidence to support our independent safety investigation.

This will include examining the condition of the train and downloading its ‘black box’ data recorder, inspecting the track, analysing data from railway signalling and radio systems, and interviewing witnesses.

The railway approaching Talerddig from each direction consists of a single track.

To allow trains to pass each other a track loop is provided.

These loops have points at each end and allow trains to enter a short length of track which lies alongside the single line.

RAIB’s initial inspection of the track on approach to the point of collision found evidence that wheel/rail adhesion was relatively low, suggesting that the train may have entered into wheel slide when braking.

This will be an area of ongoing investigation.

Our investigation is in its very early stages and an additional update will be available in the coming days once RAIB has gathered and analysed further evidence.
 
Last edited:
23 Oct 2024
1729713076148.png

1729713052358.png


Joint statement: Network Rail and Transport for Wales

The Cambrian line between Machynlleth and Shrewsbury will remain closed until at least the end of Friday 25 October following a collision between two trains on Monday night.

The incident is currently under investigation by the Rail Accident Investigation Branch and will move to a recovery operation to remove the affected trains over the coming days.

Both TfW and Network Rail would like to express our heartfelt thanks to everyone in the local community for the overwhelming level of support they have provided during this difficult incident.

A replacement bus operation will remain in place calling at all stations on the route and customers should check before they travel and allow for journeys to take longer than usual.

Services between Machynlleth and Pwllheli/Aberystwyth and between Shrewsbury and Birmingham International will continue to run as planned.

1729713211339.png
 
Lions and Wheels (British Railways’ lion emblems, 1949-1964)
On 1st January 1948, British Railways was born. It would go on to be one of the most infamous of British institutions, loved by some and reviled by many. Its corporate identity and “double arrow” logo would go on to attain international fame. But all that was to come later. The story of the early corporate identities of British Railways is one of occasional (if misplaced) design brilliance, but mostly complete confusion.

1948 - 1956​

Nicknamed 'Uni-cycling Lion' :lol:

1729805278049.png
 
Last edited:
25 Oct 2024
1729875759286.png

Cambrian line to reopen following rail accident
1729875856642.png


The Cambrian line is expected to open for normal services from Monday following the tragic rail accident earlier this week, Network Rail and Transport for Wales announced today.

The investigation teams have concluded their site-based investigation, enabling Transport for Wales (TfW) engineers access to separate the two damaged trains, which are in the process of being removed from the site.

Simultaneously, Network Rail engineers have been carrying out repairs, maintenance and a series of thorough checks and safety inspections.

Safety systems on the trains that use the line continue to be regularly checked and inspected.

Test trains will run through the area to make sure everything is operating normally before beginning passenger operations on Monday.

The incident still may affect train services in the short-term and passengers should continue to check before they travel.

Nick Millington, Network Rail’s Wales & Borders route director said:

“Monday night’s tragic events will forever be etched in my memory and my thoughts remain with all those affected. Thankfully, incidents like this are extremely rare on the railway network. We continue to operate one of the safest railway networks in Europe.

“Our engineers have been on site throughout and have conducted very thorough safety checks and we will run test trains through the area.

“I am grateful to the local community who have been very accommodating throughout this last week while we have been managing this incident.

“I would also like to thank passengers for their patience, understanding and support during the last few days as our teams have worked tirelessly to restore the railway as quickly as they could.”

Jan Chaudhry van der Velde, chief operating officer for TfW, said:

“The railways in Wales have a very good safety record, so when serious incidents like this happen, we at TfW, together with our partners at Network Rail, are determined to get to the bottom of what caused it. For that reason, we are co-operating fully with the authorities investigating the collision, and in particular, the Rail Accident Investigation Branch.

“We have worked hard to clear the trains safely from the accident site, and to carry out full safety checks and tests before reopening the line for passenger trains.

“Our condolences go to the family of the passenger who passed away, and we hope that those passengers and staff members injured in the collision make a speedy recovery.”

Due to operational challenges following the incident, there will be no TfW services running between Shrewsbury and Birmingham International on Saturday 26 or Sunday 27 October.

Ticket acceptance has been agreed with West Midlands Railways on this route, however customers are advised to use alternate routes where possible.
 
25 Oct 2024

1729876134210.png


Cambrian line to reopen following rail accident

Region & Route: Wales & Western | Wales & Western: Wales & Borders

train.jpg

Teams work to separate the damaged trains on the Cambrian Line

The Cambrian line is expected to open for normal services from Monday following the tragic rail accident earlier this week, Network Rail and Transport for Wales announced today.

The investigation teams have concluded their site-based investigation, enabling Transport for Wales (TfW) engineers access to separate the two damaged trains, which are in the process of being removed from the site.

Simultaneously, Network Rail engineers have been carrying out repairs, maintenance and a series of thorough checks and safety inspections.

Safety systems on the trains that use the line continue to be regularly checked and inspected.

Test trains will run through the area to make sure everything is operating normally before beginning passenger operations on Monday.

The incident still may affect train services in the short-term and passengers should continue to check before they travel.

Nick Millington, Network Rail’s Wales & Borders route director said: “Monday night’s tragic events will forever be etched in my memory and my thoughts remain with all those affected. Thankfully, incidents like this are extremely rare on the railway network. We continue to operate one of the safest railway networks in Europe.

“Our engineers have been on site throughout and have conducted very thorough safety checks and we will run test trains through the area.

“I am grateful to the local community who have been very accommodating throughout this last week while we have been managing this incident.

“I would also like to thank passengers for their patience, understanding and support during the last few days as our teams have worked tirelessly to restore the railway as quickly as they could.”

Jan Chaudhry van der Velde, chief operating officer for TfW, said: “The railways in Wales have a very good safety record, so when serious incidents like this happen, we at TfW, together with our partners at Network Rail, are determined to get to the bottom of what caused it. For that reason, we are co-operating fully with the authorities investigating the collision, and in particular, the Rail Accident Investigation Branch.

“We have worked hard to clear the trains safely from the accident site, and to carry out full safety checks and tests before reopening the line for passenger trains.

“Our condolences go to the family of the passenger who passed away, and we hope that those passengers and staff members injured in the collision make a speedy recovery.”

Due to operational challenges following the incident, there will be no TfW services running between Shrewsbury and Birmingham International on Saturday 26 or Sunday 27 October.

Ticket acceptance has been agreed with West Midlands Railways on this route, however customers are advised to use alternate routes where possible.
 
Last edited:
My class 52 Western has pull up alongside my Class 21.

D1003 'Western Pioneer' also in BR green.

Note the small BR emblem used as can be seen here - https://forum.thenorthpacific.org/topic/9195683/post-10708067

Also note the 'overhead electricity power warning flashes' in red, introduced circa 1961 - they have been superseded by yellow flashes on a white background.

train.jpg
 
Status
Not open for further replies.
Back
Top