Marcus' Model Railway Journey

Status
Not open for further replies.
train.jpg
train.jpg
 
Thursday 22 Oct 2026

1792685840567.png


Passengers urged to check before travelling as rail services altered ahead of Storm Austen​

Region & Route: Wales & Western: Wales & Borders

train.png

UK Wind Warning and Rail Disruption


Rail passengers across Wales are being urged to check before travelling from Friday 23 October and throughout the weekend, with precautionary changes being made to some train services ahead of severe weather.

Storm Austen is expected to bring strong winds and heavy rain from the night of Thursday 22 October into Friday, followed by another bout of wet and windy weather on Saturday.

The Met Office has issued a yellow warning for wind affecting parts of Wales on Friday, with transport disruption likely and gusts of 50–60mph possible more widely across the warning area.

Stronger winds of up to 70mph are possible in some exposed coastal locations.

As a precaution, the rail industry has agreed a number of temporary service alterations in West Wales, on the Heart of Wales line, Cambrian line and along the North Wales Coast.

Passengers travelling on these routes are strongly advised to check the latest journey information before travelling.

Rail replacement buses will be in place on affected routes, and passengers are advised that weather conditions may result in longer journey times.

Strong winds can bring trees, branches and other debris onto the railway, while heavy rain can overwhelm drainage systems, cause flooding and affect earthworks.

Wet leaves and other autumn conditions can also make the rails slippery, meaning trains need more time and distance to accelerate and brake safely.

Network Rail, Transport for Wales and Great Western Railway will be working closely throughout the weekend, with specialist weather forecasts being monitored and operational plans continually reviewed as conditions develop.

Across the Wales and Borders route, significant steps have been taken to build resilience against autumn and winter storms, to help keep the railway operating safely including:
  • Ten new weather stations installed directly on the railway network, providing real-time information on wind, rainfall and other local conditions.
  • Ten dedicated seasonal response teams positioned to react quickly to weather-related incidents.
  • Targeted, temporary timetable changes have been introduced on selected routes as an early measure to help reduce the impact of autumn weather and improve service reliability.
  • Targeted drainage improvements at locations known to be vulnerable to flooding.
  • Vegetation management to reduce the risk of trees and branches falling onto the railway during strong winds.
  • Enhanced monitoring and inspections of vulnerable locations before, during and after severe weather.
Chris Howchin, Senior Network Delivery Manager at Network Rail Wales and Borders route, said: “Severe weather can have a significant impact on the transport network, which is why a huge amount of preparation takes place on the railway before a storm arrives.

“Our teams are monitoring the forecast closely, with people and equipment ready across the route to respond quickly if needed. Our new weather stations are also giving us more detailed local information to help us make the right decisions.

“Safety will always come first and, while we’ll do everything we can to keep passengers moving, strong winds can bring trees and debris onto the railway, while heavy rain can cause flooding. That can mean speed restrictions or temporary closures while we make sure the railway is safe.

“We’d encourage passengers to check their journey before travelling and keep checking for updates throughout the weekend.”

James Gough, Customer Operations Director at Transport for Wales said: “Passengers planning to travel on Friday and throughout the weekend are urged to check their journey before travelling, as a combination of forecast severe weather and planned engineering work will affect services across parts of the Wales and Borders network.

“Amended timetables will be in place on a number of routes to help reduce the impact of severe weather and improve the resilience of the network.

“Our teams will be working closely with our colleagues at Network Rail to monitor the conditions throughout the weekend. We encourage all customers to check the TfW website for the latest travel information before setting off and allow extra time for journeys where possible.”

GWR and Network Rail Western Performance Director, Daryn McCombe, said: “We’re grateful for customers’ patience as teams across the rail industry prepare for the impact of Storm Austen. We’re working closely with Network Rail and Transport for Wales to keep services running safely, with teams ready to respond to issues such as fallen trees and debris on the railway.

“While we’ll do everything we can to keep passengers moving, severe weather can cause disruption. We’d encourage anyone planning to travel over the coming days to check the latest travel advice before setting off and keep up to date with any changes to their journey.”

Passengers should continue to check National Rail, Transport for Wales and GWR journey information before travelling.

​

Specialist forecasting from Network Rail’s weather forecasting partner MetDesk, helps teams make more informed decisions about inspections, deployment of response teams and operational measures.

This year, the Met Office has also highlighted an increased likelihood of wetter, windier and potentially stormier conditions through late autumn and into early winter, with the developing El Niño expected to be one of the strongest on record.

While El Niño does not determine individual weather events, it can increase the likelihood of unsettled conditions across the UK.
 
Thursday 22 Oct 2026
1792686251040.png

Buses to replace trains for one week as Network Rail carries out essential upgrades on Vale of Glamorgan line​

Region & Route: Wales & Western: Wales & Borders

train.jpg

TfW train pulls up at Barry Station


Passengers are being advised to plan ahead as essential track renewals and maintenance takes place between Cardiff and Bridgend via Barry, this October.

Network Rail engineers will carry out a series of essential upgrades on the Vale of Glamorgan line between Sunday 25 October and Sunday 1 November.

The work will include removing and replacing track at Llantwit Major, renewing switches and crossings at Cogan - the sections of railway that allow trains to move from one track to another – and track work between Grangetown and Eastbrook.

Teams will also carry out a range of other maintenance activities while the railway is closed, making the most of the opportunity to complete several pieces of work at the same time, to minimise disruption for passengers.

The investment will help improve the safety, reliability and long-term performance of the railway for passengers and freight.

Changes to train services

To allow the work to be carried out safely and efficiently, the railway between Cardiff Central and Penarth, Barry, Barry Island and Bridgend, via the Vale of Glamorgan line, will be closed from 22:00 on Sunday 25 October until the end of service on Sunday 1 November.

During the closure:
  • Buses will replace trains between Cardiff Central and Penarth.
  • Buses will replace trains between Cardiff Central and Barry and Barry Island.
  • Buses will replace trains between Cardiff Central and Bridgend via the Vale of Glamorgan line.
Passengers are advised to check their journey before travelling and allow additional time, as journeys using replacement buses will take longer than usual.

Martin Taylor, Chief Infrastructure Officer at Network Rail Wales and Borders route said: “We know there is never a good time to close the railway, and we’re sorry for the disruption this work will cause.

“We’ve worked closely with Transport for Wales to make sure passengers can still travel during the closure, with replacement buses running along the affected routes.

“Closing the line for a week gives our teams the time they need to carry out several important pieces of work at locations across the Vale of Glamorgan line, rather than carrying them out separately over a number of weekends.

“This work will help us maintain a safe and reliable railway for years to come, and we’d like to thank passengers for their patience while it takes place.”

Sarah Higgins, Operations Director at Transport for Wales, said: "We are working closely with our partners at Network Rail to support passengers while these essential upgrades take place on the Vale of Glamorgan line this October.

"We recognise work of this nature is disruptive and takes place during schools' half-term, but it has been scheduled to take place when there are expected to be fewer people travelling than usual.

"Rail replacement bus service will be in operation to keep everyone moving. We understand replacement buses mean longer journey times, and we would like to thank our passengers for their patience and understanding while this work is carried out.”

Passengers should check their journeys before travelling using the Transport for Wales journey planner.
 

22 Oct 2026​

1792686466268.png

Transport for Wales welcomes EV Rally Cymru to Porthmadog checkpoint​

train.jpg

EV Rally Cymru


Transport for Wales (TfW) will welcome participants in EV Rally Cymru to Porthmadog this week, as the rally passes through North Wales showcasing the progress being made in sustainable transport and electric vehicle infrastructure across the country.

Taking place on 21 and 22 October, EV Rally Cymru brings together electric vehicles, industry representatives and sustainability champions on a journey across Wales, highlighting the innovations and infrastructure helping to support the transition to lower carbon transport.

As part of this year's event, Porthmadog will serve as an official rally checkpoint, giving participants the opportunity to stop in Eryri before continuing their journey through some of Wales' most scenic and strategically important transport corridors.

Located in the Cyngor Gwynedd car park adjacent to Porthmadog Railway Station, TfW will also showcase the TrawsCymru T22 all electric bus service that travels between Caernarfon and Blaenau Ffestiniog.

TfW’s support for the EV Rally Cymru demonstrates an ongoing commitment to supporting the decarbonisation of transport and encouraging greater confidence in electric vehicle travel across Wales.

Through its work with local authorities and partners, TfW continues to play a key role in improving access to EV charging infrastructure and supporting the wider transition to more sustainable travel options.

Tony Clayton, EV Infrastructure Programme Manager at Transport for Wales, said:“We're pleased to be supporting EV Rally Cymru once again and to welcome participants to Porthmadog as they travel across Wales.

“The rally is a fantastic opportunity to highlight the progress being made in expanding Wales' EV charging network and to demonstrate the confidence people can have in travelling longer distances by electric vehicle.

“Through our work with local authorities and partners across Wales, we're helping to improve access to charging infrastructure and support the transition to lower carbon transport. Events like EV Rally Cymru play an important role in showcasing that progress and encouraging more people to make the switch to electric vehicles”

EV Rally Cymru aims to showcase the growing strength of Wales' electric vehicle network and celebrate the organisations and communities helping to drive forward the nation's decarbonisation ambitions.

The rally route highlights locations across Wales that are playing an important role in the shift towards cleaner, greener transport.

For TfW, supporting the event aligns with its wider mission to create a more sustainable and integrated transport network that works for people, communities and the environment.

1792686657266.png
 

22 Oct 2026​

1792686738493.png

First new trains enter service on the Cambrian Coast Line​

train.jpg

197e Cambrian Line


A new era for rail travel in North and Mid Wales has begun as Transport for Wales’ first new Class 197e trains enter passenger service on the Cambrian Coast Line.

The new trains that are built in Wales, are replacing trains that have served the route for more than 30 years, offering customers a more comfortable, modern and accessible journey between Machynlleth and Pwllheli.

Customers will benefit from faster Wi-Fi, at-seat power points, bilingual digital information screens and modern air-conditioning, alongside a fully accessible toilet and dedicated spaces for passengers with reduced mobility.

The introduction is part of the Welsh Government’s £800 million investment in brand-new trains across Wales and the borders.

The Class 197e fleet has been equipped to operate with the specialist signalling system used on the Cambrian Line, paving the way for more of the new trains to join the route over the coming months.

To prepare for the wider roll-out, TfW has also raised sections of the platforms at six stations along the Cambrian line, helping wheelchair users and customers with reduced mobility to get on and off the trains more easily.

1792686768837.png
 
WATCH VIDEO:
1792686994675.png




Deputy Minister for Transport, Mark Hooper, said: "These new trains mark a significant step forward for passengers, delivering the modern and reliable railway that communities along the Cambrian Coast deserve.

"This investment is about more than just new trains, it's about TfW delivering better journeys for passengers, on trains built in Wales, for the people of Wales.”


Colin Lea, Planning and Performance Director at TfW, said: “This is a proud moment for TfW and an exciting milestone for our customers across the Cambrian line. These new trains will transform journeys, with modern facilities, improved accessibility and a more comfortable travel experience.

“Replacing trains that have served the route for more than three decades is a major step forward. We’re delighted to welcome the first customers on board and look forward to introducing more of these trains across the Cambrian line in the months ahead.”


The new trains are being introduced on the Cambrian Coast first.

Until late 2026, customers travelling between the Cambrian Coast and Shrewsbury or Birmingham need to change trains at Machynlleth.

Journeys between Aberystwyth and Birmingham won’t be affected.

Additional staff are available at Machynlleth to help customers make their connection.

Customers are encouraged to check before travelling at tfw.wales/timetables or through the TfW app.


  • The first three Class 197e trains have been introduced on the Cambrian Coast Line, with more trains set to follow over the coming months, introduced onto the wider Cambrian line, between Birmingham, Machynlleth and Aberystwyth.
  • Passengers travelling between the Cambrian Coast (Pwllheli to Machynlleth) and Birmingham (via Shrewsbury) will need to change trains at Machynlleth to continue their journeys. This temporary timetable is expected to remain in place until late 2026, when new trains are rolled out across the rest of the Cambrian line.
  • Platform-raising ‘Harrington Humps’ have been installed at Aberdovey, Dyffryn Ardudwy, Llwyngwril, Talsarnau, Penrhyndeudraeth and Porthmadog.
  • Passenger Assist can be booked in advance on 033 300 50 501 for those who need support changing trains at Machynlleth.

1792687193754.png
 
Lennarts 2026 - Father Figure of the Year

The Father Figure of the Year Award is dedicated to TNP’s truest role models. The award recognizes nominees who have been the pillars of the community by whose guidance and willingness to support others inspire everyone around them to be a role model for the future generations of residents.

1793454108010.png
 

Christmas 2026 Collectors Sheet​


Two sets of the Christmas 2026 stamps are set against an exclusive festive backdrop created especially for this issue.

Includes 10 stamps in total, with two examples of every design in the collection.

train.jpg
 
Friday 6 Nov 2026

1793987728552.png


VIDEO: High-tech leaf treatment expanded across North Wales after trial records zero leaf-related delays​

Region & Route: Wales & Western: Wales & Borders

train.jpg

RRV Interflon Leaf Guard vehicle at night


Pioneering technology developed by Network Rail Wales and Borders is being rolled out more widely following encouraging results from a trial on the Conwy Valley Line, which recorded no leaf-related delays last autumn

Network Rail is expanding the use of an innovative rail treatment across North Wales following a successful trial which saw no reported slippery-rail incidents or related delays on the Conwy Valley Line last autumn, compared with almost 500 minutes of delays the previous year.

The specialist treatment, known as Interflon Leaf Guard, is sprayed directly onto the rails to break down the slippery residue left behind by fallen leaves, helping trains grip the track more effectively when accelerating and braking.

The expansion is being delivered using new technology jointly developed by Network Rail Wales and Borders and its supply chain partners.

In 2025, Wales and Borders became the first Network Rail route to introduce a computer-controlled method of applying the treatment, replacing the previous manual spraying process.

The treatment was trialled between Tal-y-Cafn and Blaenau Ffestiniog in autumn 2025, with encouraging early results.

There were no reported incidents of trains losing grip on slippery rails on the Conwy Valley Line in 2025, compared with six in each of the previous two autumns.

There were also no related delays, compared with almost 500 minutes in 2024.

The programme has now been expanded onto the North Wales Coast Line between Conwy and Anglesey, with around 650 cumulative treatment miles planned over a 12-week programme, this autumn and winter.

The locations have been selected because they have experienced significant leaf fall related rail adhesion issues in previous years.
 
train.jpg

RRV Interflon Leaf Guard vehicle at night


Tackling one of autumn’s biggest railway challenges

Leaves on the line might sound harmless, but they can cause significant disruption to train services.

When leaves fall onto damp rails and are crushed by passing trains, they form a hard, slippery layer similar to black ice on roads.

This reduces the grip between train wheels and the rails, making it harder for trains to accelerate and brake effectively, potentially leading to delays and disruption for passengers.

Interflon Leaf Guard works within the microscopic surface of the rail to break down the residue left by fallen leaves and help prevent it from building up again.

The treatment is reapplied every seven days to help maintain its effectiveness throughout the autumn period.

It forms part of Network Rail's wider preparations for autumn and winter, alongside established measures such as specialist Rail Head Treatment Trains, which travel across the network cleaning the rails.

By targeting known problem areas before issues develop, Network Rail aims to reduce the risk of disruption and help keep services running safely and reliably.
 
Last edited:
train.jpg

Interflon Leaf Guard previous manual application


First-of-its-kind application technology

Network Rail Wales and Borders has become the first route in Network Rail to jointly develop and introduce a new computer-controlled method of applying Interflon Leaf Guard.

Known as RRV-SMART, the system is fitted to a specially adapted 4x4 vehicle which can travel on both roads and railway tracks.

As the vehicle moves along the railway at around 10mph, the system continuously monitors its speed and automatically adjusts the amount of treatment sprayed onto the rails.

Previously, the treatment was applied manually.

The new technology provides a more precise, consistent and controlled application, helping teams target the areas where it is needed most.

The technology was jointly developed by Network Rail Wales and Borders, Fitzgerald Plant Services, Interflon Ireland and JCP Engineering Ireland.

Network Rail is also working closely with Transport for Wales to analyse information recorded by trains when their wheels slip on the rails.

This will help engineers better understand how effective the treatment is, assess its performance alongside other autumn measures and determine whether it could benefit other parts of the railway in future.
 
train.jpg

Comparison before and after Interflon Leaf Guard application on Conwy Valley line rails


New camera technology also being trialled

The same specially adapted vehicle is also being used to trial innovative railway monitoring technology.

Working with technology company One Big Circle, Network Rail has adapted its AiVR Focus line-scanning camera system into a portable unit that can be quickly deployed wherever it is needed.

As the vehicle travels along the railway, the camera records the track and surrounding infrastructure, helping identify potential problems or objects on the line.

The trial will explore whether the technology could provide additional monitoring on routes not regularly covered by dedicated inspection trains, helping engineers spot potential issues earlier and respond more quickly.
 
train.png

Leaf residue on tracks equivalent to black ice on roads


Helping keep passengers moving

Daniel Booth, Head of Operational Weather Strategy at Network Rail Wales and Borders, said:
"Leaves on the line might sound like a minor problem, but they can make the rails very slippery and cause significant disruption for passengers.

"That's why we're always looking for new ways to prevent problems before they affect services.

"Last autumn, we recorded no leaf-related delays on the Conwy Valley Line, compared with almost 500 minutes the previous year.

While there are a number of factors that can affect conditions on the railway, these early results are extremely encouraging.

"What makes this particularly exciting is that we've worked with our supply chain partners to pioneer a completely new way of applying the treatment, becoming the first route in Network Rail to introduce this computer-controlled technology.

"We're now expanding the programme across more of North Wales, while working closely with Transport for Wales to better understand its effectiveness.

"By combining new technology with our established autumn preparations, we're finding smarter ways to tackle known problem areas, reduce disruption and help keep passengers moving safely and reliably."

If this autumn's expanded programme proves successful, Network Rail will explore opportunities to introduce the technology on other parts of the Wales and Borders route.
 
Last edited:
1793989255945.png


Remembrance​


The stamps are issued on Armistice Day, 11 November, one of the UK’s most significant occasions of collective remembrance, marked by acts of reflection across the country.

This year also marks 110 years since the Battle of the Somme, which began on 1 July 1916 and became one of the defining battles of the First World War.

The six stamps feature specially commissioned artworks by British artist Matthew Cook, reflecting different aspects of Remembrance.

Each has been painted using a colour palette inspired by the red poppy, one of the most enduring and recognisable symbols of remembrance.


train.jpg
 
Status
Not open for further replies.
Back
Top